If I explain the foundation history and adventure of TEKNİK ORIGIN CONSTRUCTION ;
I graduated from Trabzon Yomra Science High School in 1996 and from Karadeniz Technical University in 2000 as a Civil Engineer. In my working life, which started as a part time during my university years , I worked in many projects in the private and contracting sector in Turkey, in various positions both in the construction site and in the technical office, with the experience I gained in dam, tunnel, highway, bridge - viaduct, marine constructions, infrastructure and superstructure constructions . I finished the project.
A good start is the foundation of future success.
I am happy to continue to serve this sector by establishing TEKNİK ORIJIN İNŞAAT in 2013 with the power of our managers, engineers, foremen and employees, with which we set out with the principle of approximately 25 years of experience in the sector .
TEKNİK ORIGIN İnşaat's greatest capital is its experience, which consists of workers, engineers and managers who can renew themselves and give importance to teamwork. With this experience, we will work with all our strength to be the starting point and solution partner in the design and construction of many roads, bridges and dams to be built.
12/ 2013 - |
TECHNICAL ORIGIN CONSTRUCTION IND. TRADE. LTD. ŞTİ – FOUNDER - COMPANY MANAGER |
03/2011 – 02/2014 |
ASLANCIK DAM AND HEPP (2x60 MW) – PROJECT MANAGER – EXECUTIVE BOARD MEMBER Concrete Filled Dam Body, Transmission Tunnel (6,5x6.5 Horseshoe , BA Kapl.,13.200mt), Balance Chimney (R=22 mt , 80 mt BA Coated ) HEPP Building, Penstock, Tail Water Channel Machinery Equipment Manufacturing and Installation and Architectural Works |
08 / 2009 – 02/2011 |
TEKKEKÖY SHIPYARD AND BREAKWATER CONSTRUCTION - PROJECT MANAGER Antifer Block and Main and Secondary Breakwater, Pier, Light Tower Construction and Mechanical and Electrical Installation |
05/2007 –08/2009 |
TAŞOLUK DAM SUPPLY CONSTRUCTION – PROJECT MANAGER Clay Core Rockfill Dam, Spillway , Diversion Tunnel and Downstream Bed Arrangement |
12/2006 –07/2009 |
AKENERJİ ULUABAT FORCE TUNE HEPP PROJECT (2x50 MW) – SITE CHIEF TBM Energy Tunnel (9,150 mt , single mirror) HEPP Building, Penstock ( 2100 mt, 3700 tons ), Tail Water Channel (1,150 mt ), Machinery Equipment Manufacturing and Installation ( Crane (95+10), Momoray Crane, Drainage and Cooling Water Syst.Φ3200,1800 Butterfly Valves and Caps) and Mim. Works |
04/2006–12/2006 |
BARTIN ÇAYCUMA TCK HIGHWAY Km (22+00 – 31+00) CONSTRUCTION – SITE CHIEF In Highway and Road Widening Constructions, Culvert and Bridge Constructions |
09/2005–04/2006 |
MOLU ENERJİ BAHÇELİK HEPP PROJECT CONSTRUCTION (2x2,4 MW) – SITE CHIEF HEPP Building, Penstock, Tail Water Channel, Machinery Equipment ( Crane , Momoray Crane, Valve and Covers) and Architectural Works |
08/2002–05/2005 |
BAHÇELİK DAM CONSTRUCTION – FIELD AND TECHNICAL OFFICE ENGINEER-SITE CHIEF Dam and Tunnel Construction (Hull and Spillway Construction, Drilling-Injection) and Variant Highway Construction (3,16 Km Kayseri-Malatya Highway Construction). Hydro Mechanical Manufacturing and Installation |
12/2001–08/2002 |
SIDDIKLI DAM CONSTRUCTION – FIELD AND TECHNICAL OFFICE ENGINEER Rockfill Dam Construction, Diversion Tunnel, Village Access Roads |
06/2001–12/2001 |
GÖLCÜK PART 2 SEWAGE CONSTRUCTION -- FIELD AND TECHNICAL OFFICE ENGINEER Pumping Center, Sewerage, Storm Water, Stream Improvement, Street Arrangement Constructions |
06/2000–06/2001 |
HALUK ULUSOY TFF CAMP AND TRAINING FACILITY CONSTRUCTION – FIELD ENGINEER Facility Buildings (Hotel and Administrative Building), Soil and Grass Football Field and Tennis Court Construction |
10/1997–06/2001 |
TRABZON YACHT PORT CONSTRUCTION -- FIELD ENGINEER ( Part Time ) Port Construction. ( Breakwater , Stone Fortification, Field and Crown Concrete, Pier and Dock Construction) |