logo

DENİZKONAK - UĞURLU - ÇAMALTI VILLAGES FISHING SHELTER CONSTRUCTION

DENİZKONAK - UĞURLU - ÇAMALTI VILLAGES FISHING SHELTER, THE CONSTRUCTION OF WHICH WAS TENDERED BY THE GENERAL DIRECTORATE OF INFRASTRUCTURES (AYGM) AND COMPLETED UNDER THE SUPERVISION OF TECHNICAL ORİJİN, IS LOCATED WITHIN THE BOUNDARIES OF CİDE DISTRICT OF KASTAMONU PROVINCE AND CONSTRUCTION WORKS HAVE BEEN CARRIED OUT ON THE COAST OF DENİZKONAK VILLAGE; 22 VILLAGES UP TO AYDOS SUCH AS DENZKONAK, UĞURLU, ÇAMALTI, AĞAÇBÜKÜ, ÇATALOLUK, AKBAYIR WILL BENEFIT AND 30 BOATS WILL BE ABLE TO DOCK AT THE HARBOR.

WITHIN THE SCOPE OF THIS PROJECT, THE MAIN BREAKWATER WAS FORMED WITH 13 AND 18 TONS OF ANTIFEROUS BLOCKS ON STONE FILL CORE OF VARIOUS CATEGORIES AT DEPTHS RANGING FROM -3 METERS TO -9 METERS AND THE SECONDARY BREAKWATER WAS FORMED WITH 6-8 TONS OF ROCK REINFORCEMENT ON STONE FILL CORE IN VARIOUS CATEGORIES AT DEPTHS RANGING FROM -2 METERS TO -8 METERS. IN ADDITION, THE CONCRETE FOR THE WATER RAMPS RANGING IN LENGTH FROM -2 METERS TO -4 METERS WAS POURED AND 2 STEEL LIGHTHOUSE TOWERS WERE CONSTRUCTED.

THE PROJECT CONSISTS OF THE FOLLOWING FACILITIES;

  •    230 METERS MAIN BREAKWATER
  •    120 METER SECONDARY BREAKWATER
  •    185 METER BERTH
  •    40 METERS OF BOAT SLIPS,
  •    5,000 SQUARE METER CONCRETE COVERED BACK FIELD,
  •    2 LIGHTHOUSE TOWERS
  •    SANITARY AND ELECTRICAL INSTALLATIONS

Click For Technical Specifications