THE CONSTRUCTION OF THE GELEN REGULATOR AND HES PROJECT 70 000 M³ RESERVOIR WITH COUNTER-CURRENT CONCRETE EMBANKMENT BODY REGULATOR, POWER PLANT BUILDING AND TRANSMISSION TUNNEL LOCATED ON THE PAZARSUYU STREAM WITHIN THE BOUNDARIES OF THE BULANCAK-KOVANLIK DISTRICT OF GİRESUN PROVINCE AND LOCATED ON THE PAZARSUYU STREAM, WHICH WAS TENDERED BY ULUSAL ENERJİ ELEKTRİK ÜRETİM A.Ş. AND THE CONSTRUCTION WAS COMPLETED UNDER THE TEKNİK ORİJİN.WITHIN THE SCOPE OF THE PROJECT; OPEN FIELD EXCAVATION AND CONSTRUCTION WORKS, REGULATOR AND FACILITIES (SPILLWAY, WATER INTAKE STRUCTURE, SEDIMENTATION POND, GRAVEL AND FISH PASSAGES, CURTAIN INJECTION AND DRILLING WORKS), TRANSMISSION TUNNEL (4 MT MODIFIED HORSESHOE COATING SECTION) 5X5 MT INVERTED U-CUT TRANSMISSION TUNNEL EXCAVATION, SUPPORT REINFORCED CONCRETE COATING WITH CONTACT AND CONSOLIDATION INJECTION WORKS, EVACUATION STRUCTURE, PENSTOCK AND SUSPENSION, POWER PLANT BUILDING TAIL WATER CONNECTION STRUCTURE, TAILWATER STREAM DREDGING EXCAVATIONS AND STONE EXCAVATION WORKS" CONSTRUCTIONS WORKS WERE CARRIED OUT.
THE PROJECT CONSISTS OF THE FOLLOWING FACILITIES;