WITHIN THE SCOPE OF THE CONSTRUCTION OF GÜVERCİN REGULATOR AND HES CONSTRUCTION BELONGING TO BERRAK ENERJİ ELECTRİK ÜRETİM A.Ş. IN ÇOKRAN VILLAGE OF KAHRAMANMARAS PROVINCE; IN ORDER TO SOLVE THE TRANSPORTATION PROBLEM EXPERIENCED IN THE WINTER MONTHS TO THE POWER PLANT BUILDING AND ÇOKRAN VILLAGE; SINGLE SPAN STEEL GIRDER COMPOSITE HIGHWAY BRIDGE OVER ÇAĞIRGAN STREAM; EXCAVATION-FILLING WORKS, GROUND SUPPORT, STREAM BED ARRANGEMENT, CONCRETE-MOLD AND STEEL FABRICATION WORKS WERE CARRIED OUT UNDER OUR RESPONSIBILITY AND PUT INTO SERVICE.
Click For Technical Specifications