logo

NEW YUSUFELI DRINKING WATER DISTRIBUTION LINE COMPACT GENERATOR

The production of 2 compact generators with 55kwa power to be installed on the steel pipe distribution line was completed and successfully passed the factory tests on 24.02.2022. In this way, when the drinking water line is commissioned, an average of 695,000 Kwh of energy will be generated annually without the need for any additional facilities.