IN THE SAMSUN-TEKKEKOY BREAKWATER AND SHIPYARD PORT CONSTRUCTION WORK, WHICH WAS TENDERED BY THE GENERAL DIRECTORATE OF DLH OF THE MINISTRY OF TRANSPORTATION AND CONSTRUCTED IN SAMSUN TEKKEKÖY UNDER THE CONTRACTORSHIP OF YAPI-TEK İNŞAAT SAN TİC AŞ; 1800-METER MAIN BREAKWATER, 200-METER SECONDARY BREAKWATER AND 400-METER RIGGING BREAKWATER WORKS; ROCK QUARRY OPERATION, STONE EXCAVATION WORKS, CONCRETE ANTI-SPHERE BLOCK CASTING AND PLACEMENT, DREDGING OF THE BOTTOM AND SHORE OF THE PIER, SEAWATER POURING AND KRONMAN AND FIELD CONCRETE WORKS WERE DONE AND DELIVERED BY OUR COMPANY FOUNDER ÖZGÜR KÖSE.