IN THE SAMSUN-YAKAKAKENT GÜMENEZ STREET FLOODPROOFING AND HIGHWAY BRIDGE CONSTRUCTION WORK, WHICH WAS TENDERED BY DSİ 7TH REGIONAL DIRECTORATE -SAMSUN, OPEN FIELD EXCAVATION-FILL WORKS, CONCRETE AND REINFORCED CONCRETE STRUCTURES, STONE WORKS AND BRIDGE CONSTRUCTION-GROUND SUPPORT WORKS OF 2 PCS 26 MT SINGLE SPAN PRESTRESSED PREFABRICATED GIRDER HIGHWAY BRIDGE, 13,16 MT HIGH MORTARED MASONRY REVETMENT DAM, 1276 MT LONG MORTARED STONE WALL WITH 4-6 T ROCK REINFORCED STONE REINFORCEMENT WORKS WERE CONSTRUCTED AND DELIVERED WITH TEMPORARY ACCEPTANCE.