THANKS TO THE BLUE TUNNEL DRINKING WATER SUPPLY LINE TENDERED BY DSİ GENERAL DIRECTORATE OF WATER SUPPLY DEPARTMENT AND CONTROLLED BY KONYA 4TH REGIONAL DIRECTORATE AND COMPLETED BY DOĞUŞ İNŞAAT VE TICARET AŞ , WHICH WILL PROVIDE HEALTHY, CLEAN AND UNINTERRUPTED DRINKING AND POTABLE WATER FOR APPROXIMATELY 3 MILLION PEOPLE IN THE PROVINCIAL CENTER OF KONYA, THE DISTRICT CENTER OF ÇUMRA AND THE TOWN OF ÇUMRA AND THE SURROUNDING SETTLEMENTS 100 MILLION PER YEAR AND 366 THOUSAND CUBIC METERS OF WATER PER DAY WILL BE TREATED AND DELIVERED TO CITIZENS UNTIL THE YEAR 2045.
WITHIN THE SCOPE OF THIS PROJECT, HIGHWAY AND OPEN FIELD EXCAVATION WORKS, TRANSMISSION LINE CHANNEL EXCAVATIONS, STEEL PIPE GRP PIPE DUCTILE PIPE TRANSPORTATION AND INSTALLATION, BEDDING EMBEDDING AND OTHER BACKFILLING WORKS, HYDROSTATIC TESTING, CATHODIC PROTECTION FIBER OPTIC CABLE EXCAVATION-FILLING WORKS, ART STRUCTURES (SUCTION CUPS, DRAINS, LINE VALVES), HIGHWAY HORIZONTAL CROSSING WORKS, REPAIR AND MAINTENANCE OF OLD LINES AND IMPROVEMENT OF STORAGE AREAS WORKS HAVE BEEN COMPLETED UNDER THE TEKNİK ORİJİN.
Click For Technical Specifications