IN THE CONSTRUCTION OF THE NEW YUSUFELİ DISTRICT DRINKING WATER SUPPLY LINE WITHIN THE BOUNDARIES OF YUSUFELİ DISTRICT OF ARTVIN PROVINCE, WHICH WAS TENDERED BY DSİ GENERAL DIRECTORATE ARTVIN 26TH REGIONAL DIRECTORATE AND CONTINUED UNDER OUR CONTRACT; 300 MM DIAMETER SPIRAL WELDED STEEL PIPE WILL BE TAKEN FROM THE REGULATOR TO BE CONSTRUCTED AT 1.360 METER ELEVATION IN TEKKALE VILLAGE PLATEAU TO THE MAIN WATER SUPPLY LINE.THE TOTAL LENGTH OF THE MAIN SUPPLY LINE IS 8.165 METERS, 3.050 METERS OF WHICH IS 300 MM DIAMETER AND THE REMAINING 5.115 METERS IS 250 MM DIAMETER SPIRAL WELDED STEEL PIPE. THERE ARE 5 SUCTION CUPS, 5 DISCHARGE STRUCTURES AND 1 ENERGY BREAKER VALVE STRUCTURE IN THE TRANSMISSION LINE.THE DRINKING WATER TAKEN FROM TEKKALE STREAM WILL BE BROUGHT TO THE TREATMENT PLANT WITH A CAPACITY OF 5.500 M³/DAY WHICH IS BEING CONSTRUCTED JUST ABOVE THE NEW YUSUFELI DISTRICT. THE DRINKING WATER FROM THE TREATMENT PLANT WILL BE PIPED TO THE TANKS AND NETWORK LINES WITH 225 MM DIAMETER HDPE PIPES. THE LENGTH OF THE NETWORK LINES IS 5.274 METERS.
ON THE ROUTE THERE ARE 2 TRANSPORTATION TUNNELS OF 196 METERS LONG AND 1.409 METERS LONG WITH AN EXCAVATION DIAMETER OF 6,5X6,5 MT, 1 WATER TANK OF 1.500 M³ AND 2 WATER TANKS OF 500 M³.
IN ADDITION, THE ENERGY NEEDS OF THE TREATMENT PLANT WILL BE MET BY GENERATING ELECTRICITY WITH 2 COMPACT GENERATORS WITH 55KWA POWER TO BE INSTALLED ON THE STEEL PIPE SUPPLY LINE.
Click For Technical Specifications